Top 15 articles of 2016
[edit] More than 1,400 articles were added to Designing Buildings Wiki in 2016. We've taken a look back and picked out the 15 most highly viewed.
15. What does Brexit mean for construction?
It was the biggest news story of the year, and the answer is still far from clear, but this article published on the morning of June 24th laid down some of the key areas - from the skills shortage to red tape - where construction may be most affected by Brexit.
14. Commissioning building systems
Commissioning is the process of bringing an item into operation and ensuring it is in good working order. On building projects, this refers primarily to building services, but the process is not always done well.
Folded plate structures are assemblies of flat plates, or slabs, inclined in opposing directions and joined along their longitudinal edges. This creates a structural system capable of carrying high loads without the need for additional supporting beams.
Elevations are orthographic projections of the exterior (or sometimes the interior) faces of a building. That is, they are two-dimensional drawings of the building’s façades.
Contract documents for a construction contract will typically include articles of agreement, which set out the core obligations of the parties involved.
A 'section drawing', 'section' or 'sectional drawing' shows a view of a structure as though it had been sliced in half or cut along an imaginary plane. For buildings, this can be useful as it gives a view through the spaces and surrounding structures (typically across a vertical plane) that can reveal the relationships between the different parts of the buildings that might not be apparent on plan drawings.
A wide range of different types of crane can be used on construction projects for lifting and moving materials and other building elements from one place to another. Cranes range from a simple rope pulley to tower cranes fixed to the top of a skyscraper.
Within the context of the built environment, the term ‘structure’ refers to anything that is constructed or built from different interrelated parts with a fixed location on the ground.
Long span roofs are those that exceed 12 m. They can create flexible, column-free internal spaces and can reduce substructure costs and construction times. They are commonly found in a wide range of building types such as factories, warehouses, agricultural buildings, hangars, gymnasiums and so on.
Concept drawings or sketches are drawings used by designers as a quick and simple way of exploring initial ideas. They are not intended to be accurate or definitive, merely a way of investigating and communicating design principles and aesthetic concepts.
Measurement is the transformation of drawn data into description and quantity information. Measurement is not an end in itself, it is a tool to enable other functions. It can be undertaken to value, cost, and price construction work, as well as enabling effective management.
4. Building regulations completion certificate
A completion certificate is issued by the building control body, providing formal evidence that the building works have been approved and that, in so far as it is reasonable to determine, the works have been carried out in accordance with the building regulations.
3. Typical tender process for construction projects
A tender is a submission made by a prospective supplier in response to an invitation to tender. This article describes in detail the tender process for a typical commercial construction contract.
2. Step-by-step guide to using BIM on projects
This step-by-step guide explains how level 2 Building Information Modelling (BIM) can be used for the development of a built asset such as a new building. It is written for use by people who are not BIM experts and will be helpful for employers, consultants, contractors and suppliers.
1. Valuation of interim payments
Interim valuation is a pre-cursor to the issue of an interim certificate, which in turn allows an interim payment to be made. It is a detailed breakdown, generally prepared by a contractor, that constitutes an application for part payment for work undertaken since the last valuation.
Featured articles and news
Combating burnout.
The 5 elements of seiri, seiton, seiso, seiketsu and shitsuke.
Shading for housing, a design guide
A look back at embedding a new culture of shading.
The Architectural Technology Awards
The AT Awards 2025 are open for entries!
ECA Blueprint for Electrification
The 'mosaic of interconnected challenges' and how to deliver the UK’s Transition to Clean Power.
Grenfell Tower Principal Contractor Award notice
Tower repair and maintenance contractor announced as demolition contractor.
Passivhaus social homes benefit from heat pump service
Sixteen new homes designed and built to achieve Passivhaus constructed in Dumfries & Galloway.
CABE Publishes Results of 2025 Building Control Survey
Concern over lack of understanding of how roles have changed since the introduction of the BSA 2022.
British Architectural Sculpture 1851-1951
A rich heritage of decorative and figurative sculpture. Book review.
A programme to tackle the lack of diversity.
Independent Building Control review panel
Five members of the newly established, Grenfell Tower Inquiry recommended, panel appointed.
Welsh Recharging Electrical Skills Charter progresses
ECA progressing on the ‘asks’ of the Recharging Electrical Skills Charter at the Senedd in Wales.
A brief history from 1890s to 2020s.
CIOB and CORBON combine forces
To elevate professional standards in Nigeria’s construction industry.
Amendment to the GB Energy Bill welcomed by ECA
Move prevents nationally-owned energy company from investing in solar panels produced by modern slavery.
Gregor Harvie argues that AI is state-sanctioned theft of IP.
Experimental AI housing target help for councils
Experimental AI could help councils meet housing targets by digitising records.